Grid-Connected Battery for Frequency Regulation and Grid Stabilization
SMA Altenso‘ s largest BESS project in Germany is a 130 MW/354 MWh system in Hoexter, North Rhine-Westphalia. Altenso developed this BESS and builds it as full EPC including MV and HV construction, substation and grid connection. Altenso will also provide Operations and Maintenance services (O&M) for the plant.
This battery park is among the first large-scale battery storage systems in Germany to use SMA inverters featuring SiC MOSFET technology.
Project Figures
Power
130 MW
Battery Capacity
354 MWh
Role
Project Developer, Full EPC, O&M Services
Components
38 x SCS 4600 UP-S
Monitoring
SMA Power Plant Manager
Monitoring System
Application
Frequency regulation and grid stabilization
SMA System Technology
Our power conversion units and battery containers are manufactured in a serial mass production in Kassel (Germany). We keep highest production standards and deliver worldwide even to very remote and secluded locations.
20 foot Medium Voltage Power Station (MVPS)
containing SMA Sunny Central Storage inverter technology