Grid-Connected Battery for Frequency Response Services
Altenso developed this BESS in-house and is building the project in a full EPC set-up including MV and HV constructions, delivery of the substation and transformer as well as grid connection. The project uses 231 MWh of LFP batteries and is the first of a series of grid-scale BESS of the same type. By providing O&M services during operations, Altenso remains closely involved in the project.
Project Figures
Power
92.5 MW
Battery Capacity
231 MWh
Role
Project Developer, Full EPC and O&M Provider
Components
SMA SCS 3800 UP XT and SMA MVPS 4400
Monitoring
SMA Power Plant Manager and monitoring system
Application
Frequency response services and participation in electricity markets
SMA System Technology
Our power conversion units and battery containers are manufactured in a serial mass production in Kassel (Germany). We keep highest production standards and deliver worldwide even to very remote and secluded locations.
20 foot Medium Voltage Power Station (MVPS)
containing SMA Sunny Central Storage inverter technology