The project includes a 27.4 MW solar farm, another 10.7 MW solar farm, a 11.2 MW / 5.4 MWh Leinster BESS, and interconnecting transmission infrastructure. The system solutions save over 540,000 tonnes of CO2, powering the two nickel mines from BHP.
Project figures
Power
38.2 MW
Components
4 x SCS 2900
10 x SC 4200 UP
Monitoring
SMA Power Plant Controller
Battery capacity
5.4 MWh
Role
Integrator
Application
Mining Electrification
SMA System Technology
Our power conversion units and battery containers are manufactured in a serial mass production in Kassel (Germany). We keep highest production standards and deliver worldwide even to very remote and secluded locations.
20 foot Medium Voltage Power Station (MVPS)
containing SMA Sunny Central Storage inverter technology