The inauguration of the landmark Cazombo Photovoltaic Park energy project marks the beginning of a large-scale hybrid power plant rollout across Angola. The program initiated directly by the Angolan Ministry of Energy and Water (MINEA) intends to bring power to over one million people in rural Angola.
All projects are situated in fully off-grid environments, requiring grid-forming and black-start capable systems. Cazombo features a PV+BESS hybrid plant with 25 MWp solar power and 75 MWh battery storage capacity.
The site is part of broader project pipeline with a combined battery capacity exceeding 500 MWh.
Project Figures
Power
25 MWp (solar park)
Components
11 x 40’ battery containers
7 x SCS 3800 UP
5 x SC 4600 UP
Monitoring
SMA Power Plant Manager
and SMA Hybrid Monitoring
Battery capacity
75 MWh
Role
System Integrator
Application
Mini-grid
SMA System Technology
Our power conversion units and battery containers are manufactured in a serial mass production in Kassel (Germany). We keep highest production standards and deliver worldwide even to very remote and secluded locations.
20 foot Medium Voltage Power Station (MVPS)
containing SMA Sunny Central Storage inverter technology